Summary for Test 2023-05-31-88-4
Test performed: CTM 521-June 2020Project Information
Project Identifiers | Project ID: 215317 DEA: 101J0104 EFIS: 1018000079 |
---|---|
DIST-CO-RTE-PM | 10-CAL,CAL-88,34-34.6/2.2 |
Award Date | 05/19/2022 |
Closeout Date | 11/16/2023 |
Work Description | Construct fuel island canopies. |
Location Description | In Calaveras and Alpine counties on Route 26 at the West Point Maintenance Station and on Route 88 at the Caples Lake Maintenance Station. |
QA Service Level | 1 (Verified on 07/29/2022) |
Sample Information
Sample Taken Date | 05/31/2023 | Sample Unique Key | 88 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/31/2023 |
Sample type | Quality Control | A brief description of the sample | concrete |
The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Spencer | Last name of sampler or witnessed by | Kibbe |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Sierra Tahoe Ready Mix | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | D673A |
---|---|---|---|
The truck number from where the sample was collected | 10 | The batch plant ticket number from where the sample was collected | 87428 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Concrete truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-05-31-88
DIME Test ID: 2023-05-31-88-4
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2023-12-06
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Todd Strait
Date of test: 06/28/2023
Capped in accordance with?: ASTM C1231 - Unbonded Elastomeric Pad Cap
Average diameter of cylinder 1: 6.00 in
Average diameter of cylinder 2: 6.00 in
Maximum load on cylinder 1: 139170 lb
Maximum load on cylinder 2: 139590 lb
Type of fracture pattern of cylinder 1: 2
Type of fracture pattern of cylinder 2: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 28.27 in^2
Cross sectional area of cylinder 2: 28.27 in^2
Compressive strength (to nearest 10 psi): 4930 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/6/2023 ✔