Summary for Test 2023-10-20-79-4

Test performed: CTM 227-December 2014

Project Information

Project IdentifiersProject ID: 994321
DEA: 040K1604
EFIS: 0416000044
DIST-CO-RTE-PM04-ALA,CC-80-R7.6/8.0,0.0/13.5
Award Date02/08/2023
Closeout Date09/14/2026
Work DescriptionCONSTRUCT RHMA, LIGHTING SYSTEM, AND CONCRETE BARRIER.
Location DescriptionALAMEDA AND CONTRA COSTA COUNTIES IN ALBANY AND CROCKETT FROM 0.4 MILE SOUTH OF ALAMEDA COUNTY LINE TO 0.2 MILE SOUTH OF POMONA STREET
QA Service Level1 (Verified on 10/14/2022)

Sample Information

Sample Taken Date10/20/2023 Sample Unique Key79
Date that the sample was received by the laboratory/organization performing the testing10/22/2023 Sample typeQuality Assurance
A brief description of the sample1 INCH x No. 4 The quantity of what the sample constitutesN/A
From where was the sample collectedSource First name of sampler or witnessed byIGNACIO
Last name of sampler or witnessed byARECHIGA Title of sampler
Telephone number of sampler5102077252 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCentral Oakland Plant
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)none
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedSample pick-up from Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design numberD20115EA Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-10-20-79
DIME Test ID: 2023-10-20-79-4
Testing Lab: CT D04 - Richmond Field Laboratory
Test Method: CTM 227-December 2014: Method of Test for Evaluating Cleanness of Coarse Aggregate (Cleanness)
Test Release Date: 2023-12-05

Test Results


Describe the gradation of the aggregate or the test method:: All aggregate is the same size
Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 10/22/2023
Cleanness value (single primary size): 75
General comments (publicly viewable) (Max 1000 characters): PASSED Central Oakland Plant

Test was verified on 12/5/2023 ✔