Summary for Test 2023-11-13-81-2
Test performed: AASHTO T275-07r12Project Information
| Project Identifiers | Project ID: 215677 DEA: 044G0804 EFIS: 0412000332 COOP: 042676 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80-R10.4/30.2 |
| Award Date | 01/18/2022 |
| Closeout Date | Not set |
| Work Description | Highway widening, overhead signs, and electronic toll system. |
| Location Description | In Solano County in Fairfield and Vacaville from 1.0 mile west of Red Top Road Undercrossing to 0.4 mile east of Leisure Town Road Overcrossing. |
| QA Service Level | 1 (Verified on 04/11/2022) |
Sample Information
| Sample Taken Date | 11/13/2023 | Sample Unique Key | 81 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 12/01/2023 | Sample type | Quality Assurance |
| A brief description of the sample | 3/4-INCH RHMA-G | The quantity of what the sample constitutes | N/A |
| From where was the sample collected | Source | First name of sampler or witnessed by | IGNACIO |
| Last name of sampler or witnessed by | ARECHIGA | Title of sampler | |
| Telephone number of sampler | 5102077252 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan Vallejo Batch Plant | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 412100016LB0622 | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-11-13-81
DIME Test ID: 2023-11-13-81-2
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity)
Test Release Date: 2023-12-05
Test Results
Number of tests: 3
What test procedure is performed?: Method A
Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 12/04/2023
| 1 | 2 | 3 | |
|---|---|---|---|
2.247 | 2.212 | 2.202 | |
2.220 |
General comments (publicly viewable) (Max 1000 characters): Sample 1 of the day
Vulcan Vallejo Batch Plant
Test was verified on 12/5/2023 ✔
