Summary for Test 2023-08-20-13-2

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 994803
DEA: 043J0704
EFIS: 0415000077
DIST-CO-RTE-PM04-CC-80-10.1/13.5
Award Date03/10/2023
Closeout Date10/06/2025
Work DescriptionRemove PCC and AC, place PCP and AC Resurfacing.
Location DescriptionConstruction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct.
QA Service Level1 (Verified on 05/10/2023)

Sample Information

Sample Taken Date08/20/2023 Sample Unique Key13
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/20/2023
Sample typeQuality Assurance A brief description of the sample1INCH x No.4 PCC
The quantity of what the sample constitutesSample 1 of the day From where was the sample collectedJob Site
First name of sampler or witnessed byNick Last name of sampler or witnessed byHall
Title of sampler Telephone number of sampler7072999133
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCentral Oakland Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)none
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile @ Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design number4EOCG5E1 Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-08-20-13
DIME Test ID: 2023-08-20-13-2
Testing Lab: CT D04 - Richmond Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2023-11-30

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 09/03/2023
Temperature correction: 0
Temperature of solution: 71
Clay reading (test 1): 5.3
Sand reading (test 1): 4.5
Sand equivalent (test 1): 85
Sand equivalent before temperature correction: 0
Sand equivalent after temperature correction: 0
General comments (publicly viewable) (Max 1000 characters): Central Oakland Plant PASSED

Test was verified on 11/30/2023