Summary for Test 2023-07-13-81-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993339 DEA: 024H9304 EFIS: 0219000027 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-299-44.3/44.9 |
| Award Date | 07/13/2022 |
| Closeout Date | 04/11/2024 |
| Work Description | INGOT CURVE IMPROVEMENT - CURVE IMROVEMENT |
| Location Description | IN SHASTA COUNTY NEAR INGOT FROM 2.7 MILES EAST OF SEAMANS GULCH ROAD TO 1.2 MILES WEST OF DU BOIS ROAD. |
| QA Service Level | 1 (Verified on 11/22/2021) |
Sample Information
| Sample Taken Date | 07/13/2023 | Sample Unique Key | 81 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/14/2023 | Sample type | Production Start-Up |
| A brief description of the sample | 2 bags of Combined RAP (1/2-inch) | The quantity of what the sample constitutes | Production Start-Up Evaluation |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Cindy |
| Last name of sampler or witnessed by | Bryant | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | D79298B | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Tullis — Northstate Asphalt (Redding, CA) | |
| Transportation Laboratory (TL) Number | 858124 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Northstate Asphalt |
|---|---|---|---|
| Aggregate Size | 1/2-inch | Aggregate Source | |
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2023-07-13-81
DIME Test ID: 2023-07-13-81-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-11-28
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Josh Murphy
Date of test: 07/17/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3063.0 g
Mass of the specimen and specimen basket assembly prior to ignition: 4676.4 g
Mass of HMA Sample prior to ignition: 1613.4 g
Mass Loss: 99.0 g
Mass of aggregate remaining after ignition: 1514.4 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.19 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.95 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=5.95%
Test was verified on 11/28/2023 ✔
