Summary for Test 2023-09-02-15-6
Test performed: AASHTO T275-07r12Project Information
| Project Identifiers | Project ID: 994803 DEA: 043J0704 EFIS: 0415000077 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-80-10.1/13.5 |
| Award Date | 03/10/2023 |
| Closeout Date | 10/06/2025 |
| Work Description | Remove PCC and AC, place PCP and AC Resurfacing. |
| Location Description | Construction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct. |
| QA Service Level | 1 (Verified on 05/10/2023) |
Sample Information
| Sample Taken Date | 09/02/2023 | Sample Unique Key | 15 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/02/2023 | Sample type | Quality Assurance |
| A brief description of the sample | 1/2-INCH HMA-Type A | The quantity of what the sample constitutes | LOT 2 SUBLOT 7 |
| From where was the sample collected | Source | First name of sampler or witnessed by | Nick |
| Last name of sampler or witnessed by | Hall | Title of sampler | |
| Telephone number of sampler | 7072999133 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | County Asphalt Martinez Batch Plant | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | 2 |
| Sublot number | 7 | HMA Mix Number | L230620 |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-09-02-15
DIME Test ID: 2023-09-02-15-6
Testing Lab: CT D04 - Richmond Field Laboratory
Test Method: AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity)
Test Release Date: 2023-11-28
Test Results
Number of tests: 3
What test procedure is performed?: Method A
Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 09/02/2023
| 1 | 2 | 3 | |
|---|---|---|---|
2.416 | 2.461 | 2.465 | |
2.447 |
General comments (publicly viewable) (Max 1000 characters): LOT 2 SUBLOT 7
County Martinez Batch Plant
Test was verified on 11/28/2023 ✔
