Summary for Test 2023-10-13-57-6

Test performed: AASHTO T275-07r12

Project Information

Project IdentifiersProject ID: 994803
DEA: 043J0704
EFIS: 0415000077
DIST-CO-RTE-PM04-CC-80-10.1/13.5
Award Date03/10/2023
Closeout DateNot set
Work DescriptionRemove PCC and AC, place PCP and AC Resurfacing.
Location DescriptionConstruction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct.
QA Service Level1 (Verified on 05/10/2023)

Sample Information

Sample Taken Date10/13/2023 Sample Unique Key57
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/21/2023
Sample typeQuality Assurance A brief description of the sample1/2-INCH HMA Type A
The quantity of what the sample constitutesLOT 3 SUBLOT 6 From where was the sample collectedSource
First name of sampler or witnessed byNick Last name of sampler or witnessed byHall
Title of sampler Telephone number of sampler7072999133
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCounty Asphalt Martinez Batch Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot number3
Sublot number6 HMA Mix NumberL230620

Test Details

DIME Sample ID: 2023-10-13-57
DIME Test ID: 2023-10-13-57-6
Testing Lab: CT D04 - Richmond Field Laboratory
Test Method: AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity)
Test Release Date: 2023-11-28

Test Results


Number of tests: 1
What test procedure is performed?: Method A
Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 10/21/2023
Bulk Specific Gravity: 2.411
General comments (publicly viewable) (Max 1000 characters): LOT 3 SUBLOT 6 County Asphalt Martinez Batch Plant

Test was verified on 11/28/2023