Summary for Test 2023-10-30-76-17
Test performed: CTM 533-June 2010Project Information
Project Identifiers | Project ID: 214337 DEA: 080E33U4 EFIS: 0817000075 |
---|---|
DIST-CO-RTE-PM | 08-SBD-115-R7.3/R10.0 |
Award Date | 04/26/2021 |
Closeout Date | Not set |
Work Description | ADD WB AUX & EB DECEL LANES, WIDEN I15 SW CONNECT,RAMPS/BRDG |
Location Description | SAN BERNARDINO COUNTY IN ONTARIO FROM 0.2 MILE WEST OF CUCAMONGA CREEK BRIDGE TO MILLIKEN AVENUE |
QA Service Level | 1 (Verified on 06/23/2021) |
Sample Information
Sample Taken Date | 10/30/2023 | Sample Unique Key | 76 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/03/2023 |
Sample type | Department Acceptance | A brief description of the sample | Rapid Set Concrete beams |
The quantity of what the sample constitutes | 15 Beams | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Dennis | Last name of sampler or witnessed by | Rodriguez |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | R12A1,R12A2,R12A3,R12B1,R12B2,R12B3,R12C1,R12C2,R12C3,R12D1,R12D2,R12D3,R12E1,R12E2,R12E3 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Robertson's Ready Mix - Fontana | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | SM446B2R |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 8082633 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | back of concrete truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-10-30-76
DIME Test ID: 2023-10-30-76-17
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement Concrete
Test Release Date: 2023-11-27
Test Results
Input Type: Calculated
Tester's full name: Dennis Rodriguez
Date of test: 10/31/2023
Ball penetration in freshly mixed concrete (average): 4 inch
General comments (publicly viewable) (Max 1000 characters): Set E
Test was verified on 11/27/2023 ✔