Summary for Test 2023-09-19-72-4
Test performed: CTM 518-June 2010Project Information
| Project Identifiers | Project ID: 214627 DEA: 05344904 EFIS: 0500000505 |
|---|---|
| DIST-CO-RTE-PM | 05-SBT-156-3/R8.2 |
| Award Date | 05/19/2022 |
| Closeout Date | Not set |
| Work Description | SAN BENITO ROUTE 156 IMPROVEMENT PROJECT SAN BENITO RTE 156 IMPROVEMENT PROJECT; INCLUDES NEW BRIDGE AND WIDENING OF EXISTING BRIDGE. |
| Location Description | SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 |
| QA Service Level | 1 (Verified on 01/14/2020) |
Sample Information
| Sample Taken Date | 09/19/2023 | Sample Unique Key | 72 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/19/2023 |
| Sample type | Quality Control | A brief description of the sample | concrete |
| The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Fernando | Last name of sampler or witnessed by | Vega |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Don Chapin | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | CAS5901 |
|---|---|---|---|
| The truck number from where the sample was collected | 0986 | The batch plant ticket number from where the sample was collected | 23619 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | concrete truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-09-19-72
DIME Test ID: 2023-09-19-72-4
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2023-11-21
Test Results
Input Type: Calculated
Tester's full name: Fernando Vega
Date of test: 09/19/2023
Unit weight of the concrete: 145.89 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/21/2023 ✔