Summary for Test 2023-10-30-47-7
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 994264 DEA: 010H20U4 EFIS: 0122000085 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-101-77.3/79.5 |
| Award Date | 12/15/2022 |
| Closeout Date | Not set |
| Work Description | Project Name: 5th Street Combine (Description of Work: Minor Concrete, Modify Signal and HMA) |
| Location Description | HUMBOLDT COUNTY IN EUREKA AT VARIOUS LOCATIONS FROM MCCULLENS AVENUE TO 0.1 MILE NORTH OF V STREET AND WEST AVENUE NORTHBOUND |
| QA Service Level | 1 (Verified on 09/29/2022) |
Sample Information
| Sample Taken Date | 10/30/2023 | Sample Unique Key | 47 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 11/06/2023 | Sample type | Department Acceptance |
| A brief description of the sample | 1 can of PG 58-22 binder | The quantity of what the sample constitutes | 1 can of binder |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Jayce |
| Last name of sampler or witnessed by | Brown | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | 23-318 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Mercer Fraser Plant B | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-22 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | Mercer Fraser Plant B | |
| Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2023-10-30-47
DIME Test ID: 2023-10-30-47-7
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-11-28
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Hamidullah Barati
Date of test: 11/20/2023
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 165.869 grams
Mass of empty container #2: 158.190 grams
Mass of container #1 before test (m1i): 200.740 grams
Mass of container #2 before test (m2i): 193.724 grams
Mass of container #1 after test (m1f): 200.594 grams
Mass of container #2 after test (m2f): 193.574 grams
Average mass change: -0.420 percent
General comments (publicly viewable) (Max 1000 characters): Mass Change
Test was verified on 11/28/2023 ✔
