Summary for Test 2023-09-18-98-2
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 994962 DEA: 07357304 EFIS: 0719000062 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-6.6/13.1 |
| Award Date | 04/27/2023 |
| Closeout Date | Not set |
| Work Description | REPLACE CONCRETE SLABS AND MEDIAN BARRIER, |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS, DOWNEY AND CITY OF COMMERCE FROM 0.2 MILE SOUTH OF ROUTE 5/605 SEPARATION TO 0.1 MILE NORT |
| QA Service Level | 1 (Verified on 07/13/2023) |
Sample Information
| Sample Taken Date | 09/18/2023 | Sample Unique Key | 98 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/18/2023 |
| Sample type | Quality Assurance | A brief description of the sample | LCB-RS |
| The quantity of what the sample constitutes | 4 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Aleksey | Last name of sampler or witnessed by | Souglobov |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 23-1393, 23-1428, 23-1429 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | CTS-30-EHI |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Concrete from wheelbarrow | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-09-18-98
DIME Test ID: 2023-09-18-98-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2023-11-16
Test Results
Input Type: Measured
Tester's full name: Aleksey Souglobov
Date of test: 09/18/2023
Temperature: 76 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/16/2023 ✔
