Summary for Test 2023-11-13-8-3

Test performed: ASTM C231-17a

Project Information

Project IdentifiersProject ID: 994408
DEA: 051K03U4
EFIS: 0522000026
DIST-CO-RTE-PM05-SLO-101-
Award Date10/04/2022
Closeout DateNot set
Work Description!!PLEASE CC Office Engineer Barbara Riccardi on reports to RE and SR!! Construct 2 roundabouts in Montecito along US 101.
Location DescriptionNot set
QA Service Level1 (Verified on 12/29/2022)

Sample Information

Sample Taken Date11/13/2023 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/13/2023
Sample typeQuality Assurance A brief description of the sample1 x 4 PCC Aggregate
The quantity of what the sample constitutes15 CY From where was the sample collectedSupplier
First name of sampler or witnessed byMike Last name of sampler or witnessed byBennett
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCEMEX Santa Barbara Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number1625995
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected31013569
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDischard fron concrete truck into wheelbarrow. Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-11-13-8
DIME Test ID: 2023-11-13-8-3
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: ASTM C231-17a: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-11-13

Test Results


Is wet sieving required?: Yes
Input Type: Calculated
Tester's full name: tom cromwell
Date of test: 11/13/2023
Air content: 1.2 %
Air content of the mortar fraction: 0 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/13/2023