Summary for Test 2023-06-22-76-5
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 215129 DEA: 050N73U4 EFIS: 0520000166 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-7.3/9.6 |
Award Date | 10/22/2020 |
Closeout Date | 12/11/2023 |
Work Description | !!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar, |
Location Description | SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE |
QA Service Level | 1 (Verified on 08/24/2020) |
Sample Information
Sample Taken Date | 06/22/2023 | Sample Unique Key | 76 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/22/2023 |
Sample type | Quality Control | A brief description of the sample | 1x4 concrete aggs |
The quantity of what the sample constitutes | 1 per batch | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Tim | Last name of sampler or witnessed by | Reyes |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Martin Marietta | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-42-0003 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | belt cut or stoclpile | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-06-22-76
DIME Test ID: 2023-06-22-76-5
Testing Lab: Sequoia Consultants
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-11-08
Test Results
What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Tim Reyes
Date of test: 06/22/2023
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 97 %
Cumulative percent passing the #8 sieve: 89 %
Cumulative percent passing the #16 sieve: 75 %
Cumulative percent passing the #30 sieve: 55 %
Cumulative percent passing the #50 sieve: 24 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 2.4 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/8/2023 ✔