Summary for Test 2023-11-07-30-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 994144 DEA: 060W15V4 EFIS: 0619000107 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-58,204-R53.4/R54.5,R0.0/4.6 |
| Award Date | 10/06/2022 |
| Closeout Date | 05/09/2025 |
| Work Description | MODIFY SIGNAL AND LIGHTING SYSTEMS AND REPLACE CURB RAMPS. |
| Location Description | KERN COUNTY IN BAKERSFIELD ON ROUTE 58 FROM SOUTH H STREET OVERCROSSING TO ROUTE 204 AND ON ROUTE 204 FROM ROUTE 58/204 SEPARATION TO L STREET |
| QA Service Level | 1 (Verified on 07/28/2022) |
Sample Information
| Sample Taken Date | 11/07/2023 | Sample Unique Key | 30 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/07/2023 |
| Sample type | Department Acceptance | A brief description of the sample | Sand, Silt, Rock, Clay |
| The quantity of what the sample constitutes | 40 lbs native material | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Neale | Last name of sampler or witnessed by | Brown |
| Title of sampler | Materials Tester | Telephone number of sampler | 6615498281 |
| Laboratory sample identification | 147 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | none | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Test holes at jobsite | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-11-07-30
DIME Test ID: 2023-11-07-30-1
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-11-08
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Kulwinder Rai
Date of test: 11/07/2023
Gage No.: 30681
Test No.: 147
Nuclear By: james watson
Non-Bias Plan No.: 5 even
Depth: 8
Material No.: no data
Material Type: silty sand mod, BRN and F-gravel
Impact By: james watson
Standard Count Density: 1586 g/cc
Count or Density 1: 877 g/cc
Count or Density 2: 800 g/cc
Count or Density 3: 950 g/cc
Standard Count Moisture: 622 g/cc
Moisture Count 1: 126 g/cc
Moisture Count 2: 127 g/cc
Moisture Count 3: 95 g/cc
Sum of Count or Density: 2627 g/cc
Average of Count or Density: 876 g/cc
Sum of Moisture Count: 348 g/cc
Average of Moisture Count: 116 g/cc
Count Ratio Density: 0.55
Count Ratio Moisture: 0.19
Calculated Percent Relative Compaction: 95.4 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters): Ramp Area# 45 Union Ave and Truxton PM 3.42 Curb and Gutter elevation: FSG length: 50 ft width: 2.5ft probe: 8"
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 06-0W15V4_3700_231107_147to149 | 320.11 KB | 11/08/2023 | 2023-11-07-30-1 | Info |
Test was verified on 11/8/2023 ✔
