Summary for Test 2023-07-11-73-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994785 DEA: 023H32U4 EFIS: 0221000164 |
|---|---|
| DIST-CO-RTE-PM | 02-SIS-I5-2.5/R15.9 |
| Award Date | 04/28/2023 |
| Closeout Date | Not set |
| Work Description | Roadway rehabilitation and bridge improvements along I5 in Mount Shasta |
| Location Description | SIS I5 2.5/R15.9 |
| QA Service Level | 1 (Verified on 05/03/2023) |
Sample Information
| Sample Taken Date | 07/11/2023 | Sample Unique Key | 73 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/11/2023 |
| Sample type | Production Start-Up | A brief description of the sample | Combined RAP |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Dave and Craig "Clint" | Last name of sampler or witnessed by | Lockett and Rogers |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | D79292B | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Tullis – Northstate Asphalt (Redding, CA) | Transportation Laboratory (TL) Number | 036763 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Northstate Asphalt |
|---|---|---|---|
| Aggregate Size | 1/2-inch | Aggregate Source | |
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2023-07-11-73
DIME Test ID: 2023-07-11-73-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-11-07
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Josh Murphy
Date of test: 07/17/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3109.0 g
Mass of the specimen and specimen basket assembly prior to ignition: 4693.8 g
Mass of HMA Sample prior to ignition: 1584.8 g
Mass Loss: 88.5 g
Mass of aggregate remaining after ignition: 1496.3 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.19 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.39 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=5.39
Test was verified on 11/7/2023 ✔
