Summary for Test 2023-11-02-37-2

Test performed: ASTM C1064-17

Project Information

Project IdentifiersProject ID: 994554
DEA: 032G7304
EFIS: 0322000152
DIST-CO-RTE-PM03-SAC-5-0.0/3.6
Award Date04/26/2023
Closeout DateNot set
Work DescriptionREPLACE CONCRETE SLABS WITH INDIVIDUAL PRECAST CONCRETE SLABS.
Location DescriptionSACRAMENTO COUNTY NEAR MOKELUMNE CITY FROM SACRAMENTO COUNTY LINE TO 0.5 MILE NORTH OF DIERSSEN ROAD OVERCROSSING
QA Service Level1 (Verified on 05/15/2023)

Sample Information

Sample Taken Date11/02/2023 Sample Unique Key37
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/02/2023
Sample typeQuality Control A brief description of the sample1 CY of Concrete for Testing
The quantity of what the sample constitutes1 CY of Concrete for Testing From where was the sample collectedFabricator
First name of sampler or witnessed byMark Patrick Last name of sampler or witnessed byBaddu
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCon-Fab California, LLC Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberK85CP1L
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected9687
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBed DELTA, 7th Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-11-02-37
DIME Test ID: 2023-11-02-37-2
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Test Release Date: 2023-11-06

Test Results


Input Type: Calculated
Tester's full name: Patrick Wright
Date of test: 11/02/2023
Temperature: 74 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/6/2023