Summary for Test 2023-10-04-60-5

Test performed: AASHTO T301-22

Project Information

Project IdentifiersProject ID: 995105
DEA: 023J8104
EFIS: 0222000086
DIST-CO-RTE-PM02-SIS-3-0.408/7.1
Award Date03/17/2023
Closeout Date04/11/2024
Work DescriptionScott Mountain Overlay
Location DescriptionNot set
QA Service Level1 (Verified on 08/24/2023)

Sample Information

Sample Taken Date10/04/2023 Sample Unique Key60
Date that the sample was received by the laboratory/organization performing the testing10/25/2023 Sample typeDepartment Acceptance
A brief description of the sample3/8" HMA w/24% RAP The quantity of what the sample constitutes1 of 1 can
From where was the sample collectedJob Site First name of sampler or witnessed byC. rogers
Last name of sampler or witnessed byUnknown Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameValero - Benicia, CA
Transportation Laboratory (TL) Number825053 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 58-34 M
ModifiedYes Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierValero Marketing & Supply - Benicia CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Test Details

DIME Sample ID: 2023-10-04-60
DIME Test ID: 2023-10-04-60-5
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2023-10-30

Test Results


Input Type: Measured
Tester's full name: Alonso Lopez-Sanchez
Date of test: 10/27/2023
Final Reading from the testing machine (X): 3.0 cm
% Elongation Recovery: 85 %
General comments (publicly viewable) (Max 1000 characters): ER

Test was verified on 10/30/2023 ✔