Summary for Test 2023-08-31-62-3
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-215-2.7 |
| Award Date | 03/04/2021 |
| Closeout Date | 06/03/2025 |
| Work Description | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. |
| Location Description | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
| Sample Taken Date | 08/31/2023 | Sample Unique Key | 62 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/01/2023 |
| Sample type | Quality Control | A brief description of the sample | 6x12 concrete cylinders |
| The quantity of what the sample constitutes | 6 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Glenn | Last name of sampler or witnessed by | McCall |
| Title of sampler | QC Field Technician | Telephone number of sampler | |
| Laboratory sample identification | Set 1 | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | Job site | Transportation Laboratory (TL) Number | Unknown |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 1610974 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | Set 1 | |
| A detailed description of where the material sample was collected | Only Truck RW106 Stem | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-08-31-62
DIME Test ID: 2023-08-31-62-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2023-10-24
Test Results
Input Type: Calculated
Tester's full name: Glenn McCall
Date of test: 08/31/2023
Temperature: 87 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/24/2023 ✔