Summary for Test 2023-10-20-13-1
Test performed: CTM 342-August 2012Project Information
Project Identifiers | Project ID: 993279 DEA: 010E0904 EFIS: 0113000123 |
---|---|
DIST-CO-RTE-PM | 01-MEN-20-33.3/34.4 |
Award Date | 05/06/2022 |
Closeout Date | Not set |
Work Description | CONSTRUCT NEW BRIDGE, REMOVE TWO BRIDGES, EARTHWORK AND PAVING. (Bridge No. 10-0310) |
Location Description | MENDOCINO COUNTY NEAR UKIAH FROM 0.3 MILE WEST OF RUSSIAN RIVER BRIDGE AND OVERHEAD TO 0.3 MILE EAST OF COUNTY ROAD 144 |
QA Service Level | 1 (Verified on 10/04/2021) |
Sample Information
Sample Taken Date | 10/20/2023 | Sample Unique Key | 13 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/20/2023 |
Sample type | Department Acceptance | A brief description of the sample | Skid Portable |
The quantity of what the sample constitutes | Skid Testing | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jessie | Last name of sampler or witnessed by | Wilson |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Job Site | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | Russian River Br. |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
---|---|---|---|
Type of Traffic Control Provided | Behind K-Rail/Barrier | DIST-CO-RTE | 01-Men-20 |
Direction of Travel | East | Post Mile | |
Lanes to be Tested | Lane #1 | Station | 25+50 |
Test Details
DIME Sample ID: 2023-10-20-13
DIME Test ID: 2023-10-20-13-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-10-23
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 10/20/2023
Air Temperature: 60 F
Tire Pressure: 25 psi
Equipment PST #: 1000-9
Is Calibration within ± values: Yes
Weather: Clear
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: Beginning of Bridge
Edge used to measure position: Left of right bridge wall
Reference Distance 1: 25+50 ft
Reference Distance 2: 25+53 ft
Reference Distance 3: 25+56 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 19 ft
Position for Stationing 2: 19 ft
Position for Stationing 3: 19 ft
Percent Grade for 1st Stationing: 0.0 %
Percent Grade for 2nd Stationing: 1.0 %
Percent Grade for 3rd Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.24
Corrected Coefficients of Friction for Stationing 2: 0.25
Corrected Coefficients of Friction for Stationing 3: 0.20
Average Coefficient of Friction: 0.23
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/23/2023 ✔