Summary for Test 2023-05-17-127-1
Test performed: ASTM C39-18Project Information
| Project Identifiers | Project ID: 214892 DEA: 06442554 EFIS: 0612000176 COOP: 061699 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-46-29.7/31.9 |
| Award Date | 01/08/2021 |
| Closeout Date | 01/08/2026 |
| Work Description | CONVERT 2-LANE TO 4-LANE HMA PAVEMENT AND CONSTRUCT NEW BRIDGE. |
| Location Description | KERN COUNTY AT AND NEAR LOST HILLS FROM 0.2 MILE WEST OF CALIFORNIA AQUEDUCT BRIDGE TO 1.4 MILES EAST OF LOST HILLS ROAD |
| QA Service Level | 1 (Verified on 06/17/2020) |
Sample Information
| Sample Taken Date | 05/17/2023 | Sample Unique Key | 127 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/17/2023 | Sample type | Quality Control |
| A brief description of the sample | Structural Concrete | The quantity of what the sample constitutes | 2 cylinders |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Jose |
| Last name of sampler or witnessed by | Tellez | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Golden Empire | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | ND15518C |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 207296212 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Abut 2 approach slab | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-05-17-127
DIME Test ID: 2023-05-17-127-1
Testing Lab: Sequoia Consultants
Test Method: ASTM C39-18: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Test Release Date: 2023-10-20
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Axel Ortega
Date of test: 06/14/2023
Average diameter of cylinder 1: 6.00 in
Average diameter of cylinder 2: 6.00 in
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Maximum load on cylinder 1: 115310 lb
Maximum load on cylinder 2: 121280 lb
Type of fracture pattern of cylinder 1: 5
Type of fracture pattern of cylinder 2: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 28.27 in^2
Cross sectional area of cylinder 2: 28.27 in^2
Compressive strength (to nearest 10 psi): 4180 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/20/2023 ✔
