Summary for Test 2023-10-20-5-3
Test performed: ASTM C231-17aProject Information
Project Identifiers | Project ID: 994239 DEA: 010H0214 EFIS: 0118000107 |
---|---|
DIST-CO-RTE-PM | 01-HUM-169-19.0/33.0 |
Award Date | 12/07/2022 |
Closeout Date | Not set |
Work Description | Cappell Walls |
Location Description | HUMBOLDT COUNTY NEAR PECWAN FROM 3.4 MILES WEST OF CAPPELL CREEK BRIDGE TO 0.4 MILE EAST OF WEITCHPEC SCHOOL ROAD (Description of Work: Construct Soldier Pile Wall, Install Drainage, Place HMA (Type A)) |
QA Service Level | 1 (Verified on 09/22/2022) |
Sample Information
Sample Taken Date | 10/20/2023 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/20/2023 |
Sample type | Quality Control | A brief description of the sample | Concrete Test Samples |
The quantity of what the sample constitutes | 9- 4X8 Cylinders | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Donald | Last name of sampler or witnessed by | Juneman |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Precast Unlimited | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | PC65A0E1 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 34233 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Back of Truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-10-20-5
DIME Test ID: 2023-10-20-5-3
Testing Lab: Universal Precast Concrete - Redding
Test Method: ASTM C231-17a: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-10-26
Test Results
Is wet sieving required?: No
Input Type: Calculated
Tester's full name: Donald Juneman
Date of test: 10/20/2023
Air content: 3.3 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/26/2023 ✔