Summary for Test 2023-09-12-92-7
Test performed: AASHTO T269-14Project Information
| Project Identifiers | Project ID: 993825 DEA: 040Q30U4 EFIS: 0420000235 COOP: 042830A3,042830A4 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA,CC-680-R11.0/R21.9,R0.0/R0.9 |
| Award Date | 11/23/2022 |
| Closeout Date | Not set |
| Work Description | PRECAST CONC PVMT, ELECTRONIC TOLL SYSTEM, JPCP, CB & STRUCTURAL CONC |
| Location Description | ALAMEDA AND CONTRA COSTA COUNTIES AT SUNOL AND IN SAN RAMON BETWEEN 0.4 MILE SOUTH OF CALAVERAS ROAD UNDERCROSSING TO 0.9 MILE NORTH OF ALCOSTA BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 05/11/2022) |
Sample Information
| Sample Taken Date | 09/12/2023 | Sample Unique Key | 92 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/13/2023 |
| Sample type | Quality Assurance | A brief description of the sample | Hot Mix Asphalt |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Bhalinder | Last name of sampler or witnessed by | Pandher |
| Title of sampler | Assistant Resident Engineer | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Vulcan Pleasanton Plant | Transportation Laboratory (TL) Number | C0912014 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | LOT 1 SUBLOT 4 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 1 |
| Sublot number | 4 | HMA Mix Number | 220304 |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-09-12-92
DIME Test ID: 2023-09-12-92-7
Testing Lab: CT D04 - Pleasanton Field Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2023-10-16
Test Results
Number of tests: 3
Is the sample lab compacted or field compacted?:
Input Type: Measured
Tester's full name: Rob Lohman
Date of test: 09/15/2023
| 1 | 2 | 3 | ||||
|---|---|---|---|---|---|---|
| 2.347 | 2.427 | 2.334 | ||||
| 2.514 | ||||||
6.6 % | 3.5 % | 7.2 % | ||||
5.8 % | ||||||
General comments (publicly viewable) (Max 1000 characters): Lot 1 Sublot 5
Test was verified on 10/16/2023 ✔
