Summary for Test 2013-09-09-13303115-6
Test performed: CTM 521-June 2012Project Information
Project Identifiers | Project ID: 7780 DEA: 112T1824 EFIS: 1100020051 |
---|---|
DIST-CO-RTE-PM | 11-SD-805-4.7/5.6 |
Award Date | 01/03/2013 |
Closeout Date | 09/07/2018 |
Work Description | REPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR). |
Location Description | SAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 12/10/2012) |
Sample Information
Sample Taken Date | 09/09/2013 | Sample Unique Key | 13303115 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | Not set |
Sample type | Quality Control | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 4 cylinders | From where was the sample collected | Source |
First name of sampler or witnessed by | Halden | Last name of sampler or witnessed by | George |
Title of sampler | CWE Lab Tech | Telephone number of sampler | (925) 989-6385 |
Laboratory sample identification | 2013-09-09-1330 | Linked DIME Sample ID | Not set |
The fabricator/manufacturer/facility name | Vulcan | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Junction Structure |
Material Information
Material Type | Concrete | The concrete mix design number | 103612F |
---|---|---|---|
The truck number from where the sample was collected | 336 | The batch plant ticket number from where the sample was collected | 1 |
Concrete batch plant | Not set | The fabricator/manufacturer designation for the sample | Vulcan |
A detailed description of where the material sample was collected | Junction Structure System 5 N | Where the material sample would have been placed if not sampled | Not set |
From Lot No. | Not set | Bag Lot No. | Not set |
Test Details
DIME Sample ID: 2013-09-09-13303115
DIME Test ID: 2013-09-09-13303115-6
Testing Lab: Vulcan Materials Company - San Diego
Test Method: CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2013-11-25
Test Results
Number of specimens:
Input Type: Calculated
Tester's full name: Christian Wheeler
Date of test: 11/04/2013
Correction factor: no data
Cylinder Age: 56 days
Break Description of Cylinder 1 (if not 'cone'): no data
Compressive Strength of Cylinder 1: 5320 lb/in^2
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/25/2013 ✔