Summary for Test 2023-10-03-54-1

Test performed: ASTM D217-16

Project Information

Project IdentifiersProject ID: 994845
DEA: 061E6104
EFIS: 0622000068
DIST-CO-RTE-PM06-TUL-63-2.0/4.0
Award Date04/06/2023
Closeout Date02/26/2024
Work DescriptionFOR CONSTRUCTION ON STATE HIGHWAY IN TULARE COUNTY NEAR VISALIA FROM EAST CARTMILL AVENUE TO AVENUE 264
Location DescriptionIn District 06 On Route 63
QA Service Level1 (Verified on 06/14/2023)

Sample Information

Sample Taken Date10/03/2023 Sample Unique Key54
Date that the sample was received by the laboratory/organization performing the testing10/10/2023 Sample typeDepartment Acceptance
A brief description of the samplePG 64-16 The quantity of what the sample constitutes1 of 1 can
From where was the sample collectedJob Site First name of sampler or witnessed byJEEF
Last name of sampler or witnessed byUnknown Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameDeer Creek Rock and Asphalt
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Rubber Binder Asphalt modifier supplierDEER GREEK ASPHALT
Performance GradePG 64-16 Lot number
Sublot number Asphalt Rubber Binder Mix Number

Test Details

DIME Sample ID: 2023-10-03-54
DIME Test ID: 2023-10-03-54-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Test Release Date: 2023-10-12

Test Results


Determination: Unworked Penetration
Input Type: Measured
Tester's full name: Raul Cardenas
Date of test: 10/12/2023
Unworked Penetration, Test 1: 44 0.1 mm
Unworked Penetration, Test 2: 45 0.1 mm
Unworked Penetration, Test 3: 45 0.1 mm
Unworked Penetration: 45 0.1 mm
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/12/2023 ✔