Summary for Test 2023-10-03-49-1
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 994264 DEA: 010H20U4 EFIS: 0122000085 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-101-77.3/79.5 |
| Award Date | 12/15/2022 |
| Closeout Date | Not set |
| Work Description | Project Name: 5th Street Combine (Description of Work: Minor Concrete, Modify Signal and HMA) |
| Location Description | HUMBOLDT COUNTY IN EUREKA AT VARIOUS LOCATIONS FROM MCCULLENS AVENUE TO 0.1 MILE NORTH OF V STREET AND WEST AVENUE NORTHBOUND |
| QA Service Level | 1 (Verified on 09/29/2022) |
Sample Information
| Sample Taken Date | 10/03/2023 | Sample Unique Key | 49 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/03/2023 |
| Sample type | Department Acceptance | A brief description of the sample | Class 2 AB |
| The quantity of what the sample constitutes | 500 yd3 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Arvin | Last name of sampler or witnessed by | Lal |
| Title of sampler | ARE | Telephone number of sampler | 7074964348 |
| Laboratory sample identification | 23-277 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Mercer Fraser | Transportation Laboratory (TL) Number | C724207 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-12-0002 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Class 2 AB | The fabricator/manufacturer designation for the sample | |
| The plant number | A detailed description of where the material sample was collected | Stockpile @ Yard | |
| Where the material sample would have been placed if not sampled | under curb ramps 5th Street | Primary Aggregate Nominal Size | 3/4 inch |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-10-03-49
DIME Test ID: 2023-10-03-49-1
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-10-10
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Jayce Brown
Date of test: 10/05/2023
| Sieve Size | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 97 % | ||||||
| 85 % | ||||||
| 76 % | ||||||
| 54 % | ||||||
| 41 % | ||||||
| 32 % | ||||||
| 25 % | ||||||
| 17 % | ||||||
| 12 % | ||||||
| 9.6 % | ||||||
General comments (publicly viewable) (Max 1000 characters): Passing 200 is outside of operating range, but within contract compliance
Test was verified on 10/10/2023 ✔