Summary for Test 2023-10-05-9-2
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 215753 DEA: 050N72U4 EFIS: 0520000169 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-4.4/R7.7 |
Award Date | 03/01/2021 |
Closeout Date | Not set |
Work Description | Please cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B. |
Location Description | 101 freeway in Summerland, CA |
QA Service Level | 1 (Verified on 05/06/2021) |
Sample Information
Sample Taken Date | 10/05/2023 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/05/2023 |
Sample type | Quality Assurance | A brief description of the sample | 1 x 4 PCC Aggregate |
The quantity of what the sample constitutes | 12 Cy | From where was the sample collected | Supplier |
First name of sampler or witnessed by | mike | Last name of sampler or witnessed by | Bennett |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Calportland Lompoc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-40-0013 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Stockpile @ Plant | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | 710RH101S | Lot number | |
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-10-05-9
DIME Test ID: 2023-10-05-9-2
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-10-05
Test Results
What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Michael Bennett
Date of test: 10/05/2023
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 98 %
Cumulative percent passing the #8 sieve: 88 %
Cumulative percent passing the #16 sieve: 75 %
Cumulative percent passing the #30 sieve: 51 %
Cumulative percent passing the #50 sieve: 22 %
Cumulative percent passing the #100 sieve: 6 %
Cumulative percent passing the #200 sieve: 2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/5/2023 ✔