Summary for Test 2023-10-02-5-3

Test performed: ASTM C117-17

Project Information

Project IdentifiersProject ID: 214830
DEA: 043G6304
EFIS: 0412000409
DIST-CO-RTE-PM04-SCL-4-SCl-9 -4.75/4.9
Award Date11/08/2022
Closeout Date09/08/2026
Work DescriptionSaratoga Creek Bridge Rehabilitation Project
Location DescriptionSan Jose - Saratoga Creek
QA Service Level1 (Verified on 11/09/2020)

Sample Information

Sample Taken Date10/02/2023 Sample Unique Key5
Date that the sample was received by the laboratory/organization performing the testing10/02/2023 Sample typeQuality Control
A brief description of the sample1 bucket of 1/2", 3/8" and Sand The quantity of what the sample constitutes1 bucket of 1", 3/8" and Sand
From where was the sample collectedFabricator First name of sampler or witnessed byMark Patrick
Last name of sampler or witnessed byBaddu Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameConFab Lathrop
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Confab California Lathrop
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-10-02-5
DIME Test ID: 2023-10-02-5-3
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C117-17: Standard Test Method for Materials Finer than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing
Test Release Date: 2023-10-04

Test Results


Input Type: Calculated
Tester's full name: Mark Patrick Baddu
Date of test: 10/04/2023
The method used?: Procedure A
Percent finer than No. 200 sieve: 1.3 %
General comments (publicly viewable) (Max 1000 characters): Sand: 1.3% 3/8": 1.1% 1/2": 0.7%

Test was verified on 10/4/2023 ✔