Summary for Test 2023-09-21-75-3
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993192 DEA: 024H4404 EFIS: 0218000119 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-70-0.0/29.9 |
| Award Date | 02/10/2022 |
| Closeout Date | 05/15/2024 |
| Work Description | CONSTRUCT SOLDIER PILE RETAINING WALL, REPAIR RSP AND HMA PAVING. |
| Location Description | PLUMAS COUNTY AT VARIOUS LOCATIONS FROM BUTTE COUNTY LINE TO 3.1 MILES WEST OF ROUTE 89 |
| QA Service Level | 1 (Verified on 08/23/2021) |
Sample Information
| Sample Taken Date | 09/21/2023 | Sample Unique Key | 75 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/22/2023 | Sample type | Production Start-Up |
| A brief description of the sample | 2 bags of Fine RAP | The quantity of what the sample constitutes | Production Start-Up Evaluation |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Dawn |
| Last name of sampler or witnessed by | Sloatermen | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | D79355B | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Q&D Construction - Mustang Hot Plant (Sparks, NV) | |
| Transportation Laboratory (TL) Number | 823627 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Mustang Hot Plant |
|---|---|---|---|
| Aggregate Size | 3/8-inch | Aggregate Source | |
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2023-09-21-75
DIME Test ID: 2023-09-21-75-3
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-10-05
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Terry McCormick
Date of test: 09/25/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3108.2 g
Mass of the specimen and specimen basket assembly prior to ignition: 4719.9 g
Mass of HMA Sample prior to ignition: 1611.7 g
Mass Loss: 121.5 g
Mass of aggregate remaining after ignition: 1490.2 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.19 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.35 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=7.35%
Test was verified on 10/5/2023 ✔
