Summary for Test 2023-09-11-63-1

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 994621
DEA: 120T6404
EFIS: 1222000074
DIST-CO-RTE-PM12-ORA-72-11.4/12.0
Award Date04/13/2023
Closeout DateNot set
Work DescriptionPLACE RHMA-G AND MODIFY SIGNAL AND LIGHTING SYSTEM.
Location DescriptionORANGE COUNTY IN LA HABRA FROM JUNCTION 39 AT WHITTIER-BEACH TO VALLEY HOME AVENUE
QA Service Level1 (Verified on 07/07/2023)

Sample Information

Sample Taken Date09/11/2023 Sample Unique Key63
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/14/2023
Sample typeProduction Start-Up A brief description of the samplePG Asphalt Binder
The quantity of what the sample constitutes1 Quart Can From where was the sample collectedSupplier
First name of sampler or witnessed byCuong Pham QC Last name of sampler or witnessed byCuong Pham QC
Title of sampler Telephone number of sampler
Laboratory sample identification0472-23 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan - Irwindale Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierLunday Thagard Company-World Oil - South Gate CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number

Test Details

DIME Sample ID: 2023-09-11-63
DIME Test ID: 2023-09-11-63-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-09-27

Test Results


Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 09/26/2023
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 170.720 grams
Mass of empty container #2: 172.921 grams
Mass of container #1 before test (m1i): 205.543 grams
Mass of container #2 before test (m2i): 207.542 grams
Mass of container #1 after test (m1f): 205.516 grams
Mass of container #2 after test (m2f): 207.499 grams
Average mass change: -0.101 percent
General comments (publicly viewable) (Max 1000 characters): - 0.101 + 0.006 = - 0.095

Test was verified on 9/27/2023