Summary for Test 2023-09-12-80-1

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 994589
DEA: 081H4914
EFIS: 0819000118
DIST-CO-RTE-PM08-SBD-18-53.1/69.0
Award Date05/16/2023
Closeout Date08/01/2024
Work DescriptionREPLACE AC SURF, HMA (TYPE A), AND COLD CENTRAL PLANT RECYCLING.
Location DescriptionSAN BERNARDINO COUNTY NEAR BIG BEAR LAKE FROM 0.4 MILE EAST OF PINEVIEW DRIVE TO 0.1 MILE NORTH OF RICHARD STREET AND VISALIA AVENUE
QA Service Level1 (Verified on 07/14/2023)

Sample Information

Sample Taken Date09/12/2023 Sample Unique Key80
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/13/2023
Sample typeQuality Assurance A brief description of the sample3/4" HMA A
The quantity of what the sample constitutes1 bag From where was the sample collectedSupplier
First name of sampler or witnessed byBlue Diamond Last name of sampler or witnessed byQC
Title of samplerQC Telephone number of sampler
Laboratory sample identificationtest 2 763 tons out at 0936am Linked DIME Sample ID
The fabricator/manufacturer/facility nameBlue Diamond Victorville Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number1
Sublot number24 HMA Mix Number

Test Details

DIME Sample ID: 2023-09-12-80
DIME Test ID: 2023-09-12-80-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2023-09-25

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: NATHAN OGBASELIASIE
Date of test: 09/13/2023
Cumulative percent passing the 2 in. sieve: 0 %
Cumulative percent passing the 1 1/2 in. sieve: 0 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 98 %
Cumulative percent passing the 1/2 in. sieve: 89 %
Cumulative percent passing the 3/8 in. sieve: 75 %
Cumulative percent passing the #4 sieve: 56 %
Cumulative percent passing the #8 sieve: 46 %
Cumulative percent passing the #16 sieve: 35 %
Cumulative percent passing the #30 sieve: 24 %
Cumulative percent passing the #50 sieve: 13 %
Cumulative percent passing the #100 sieve: 6 %
Cumulative percent passing the #200 sieve: 3.2 %
General comments (publicly viewable) (Max 1000 characters): SIEVE NO 30 IS OUT OF THE OPERATING RANGE

Test was verified on 9/25/2023