Summary for Test 2023-09-15-45-3

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 215242
DEA: 060H3604
EFIS: 0600000935
COOP: 061720
DIST-CO-RTE-PM06-FRE-99-28.1/30.9
Award Date09/16/2021
Closeout DateNot set
Work DescriptionVeterans Blvd project includes 6-lane arterial roadway in NW Fresno, freeway interchange at SR-99; grade separations over the Union Pacific Railroad, HSR line & Golden State Blvd & multi-purpose trail & adaptive intelligent transportation system tech.
Location DescriptionSR 99 & Veterans Blvd Interchange Alignment between W Hendon Ave to W Shaw Ave
QA Service Level2 (Verified on 10/15/2020)

Sample Information

Sample Taken Date09/15/2023 Sample Unique Key45
Date that the sample was received by the laboratory/organization performing the testing09/15/2023 Sample typeDepartment Acceptance
A brief description of the sampleBRIDGE DECK The quantity of what the sample constitutesBRIDGE DECK
From where was the sample collectedJob Site First name of sampler or witnessed byHARISH
Last name of sampler or witnessed byTHAKUR Title of sampler
Telephone number of sampler9152961873 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameJOB SITE
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypeNot set
Type of Traffic Control ProvidedNot set DIST-CO-RTENot set
Direction of TravelNot set Post MileNot set
Lanes to be TestedNot set StationNot set

Test Details

DIME Sample ID: 2023-09-15-45
DIME Test ID: 2023-09-15-45-3
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2023-11-06

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 09/21/2023
Air Temperature: 61
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: SUNNY
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: RIGHT OF WALL
Reference Distance 1: 100
Reference Distance 2: 103
Reference Distance 3: 106
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 22
Position for Stationing 2: 22
Position for Stationing 3: 22
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.33
Corrected Coefficients of Friction for Stationing 2: 0.39
Corrected Coefficients of Friction for Stationing 3: 0.38
Average Coefficient of Friction: 0.37
General comments (publicly viewable) (Max 1000 characters): GOLDEN STATE/42C-0673. APPROACH AND DEPARTURE SLABS DID NOT MEET SPECS

Test was verified on 11/6/2023 ✔