Summary for Test 2023-06-29-66-2

Test performed: AASHTO T176-08

Project Information

Project IdentifiersProject ID: 993184
DEA: 040A7724
EFIS: 0420000288
COOP: 0422825
DIST-CO-RTE-PM04-ALA-80-6.4/6.8
Award Date01/04/2022
Closeout DateNot set
Work DescriptionExcavation, HMA, structural concrete, minor concrete and drainage.
Location DescriptionIN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD
QA Service Level1 (Verified on 04/08/2022)

Sample Information

Sample Taken Date06/29/2023 Sample Unique Key66
Date that the sample was received by the laboratory/organization performing the testing06/29/2023 Sample typeQuality Assurance
A brief description of the sample1/2-INCH HMA-SP Type A 15%RAP The quantity of what the sample constitutesN/A
From where was the sample collectedSource First name of sampler or witnessed byNick
Last name of sampler or witnessed byHall Title of sampler
Telephone number of sampler7072999133 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameVulcan Vallejo Batch Plant
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-48-0002
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number311101510LB0221

Test Details

DIME Sample ID: 2023-06-29-66
DIME Test ID: 2023-06-29-66-2
Testing Lab: CT D04 - Richmond Field Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2023-09-21

Test Results


How many times will the test be run?: Once
Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 06/29/2023
Sand Equivalent: 79
General comments (publicly viewable) (Max 1000 characters): Vulcan Vallejo Batch Plant 15%RAP

Test was verified on 9/21/2023 ✔