Summary for Test 2023-09-06-56-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994620 DEA: 120T6304 EFIS: 1222000073 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-39-3.2/5.8 |
| Award Date | 06/12/2023 |
| Closeout Date | 06/18/2024 |
| Work Description | COLD PLANE AC PVMT AND PLACE RHMA. |
| Location Description | ORANGE COUNTY IN HUNTINGTON BEACH FROM ELLIS AVENUE/MAIN STREET TO STARK DRIVE |
| QA Service Level | 1 (Verified on 07/07/2023) |
Sample Information
| Sample Taken Date | 09/06/2023 | Sample Unique Key | 56 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/06/2023 |
| Sample type | Quality Assurance | A brief description of the sample | 1/2 RHMAG |
| The quantity of what the sample constitutes | RHMAG, AGG | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Jimmy | Last name of sampler or witnessed by | Pham |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 23-0896 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | RJ Noble Orange | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-09-06-56
DIME Test ID: 2023-09-06-56-1
Testing Lab: CT D12 - Huntington Beach Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-09-22
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: David Nguyen
Date of test: 09/19/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3956.0 g
Mass of the specimen and specimen basket assembly prior to ignition: 5547.1 g
Mass of HMA Sample prior to ignition: 1591.1 g
Mass Loss: 118.2 g
Mass of aggregate remaining after ignition: 1472.9 g
Correction Factor (Percent by mass of HMA Specimen): 0.02 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.41 %
General comments (publicly viewable) (Max 1000 characters):
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 2023AC-SP-0071 | 105.85 KB | 09/19/2023 | 2023-09-06-56-1 | Info |
Test was verified on 9/22/2023 ✔
