Summary for Test 2023-08-28-59-5
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 995104 DEA: 023J7504 EFIS: 0222000080 |
|---|---|
| DIST-CO-RTE-PM | 02-LAS-139-32/38 |
| Award Date | 03/06/2023 |
| Closeout Date | 11/27/2024 |
| Work Description | Grasshopper CIR |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 08/24/2023) |
Sample Information
| Sample Taken Date | 08/28/2023 | Sample Unique Key | 59 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/28/2023 |
| Sample type | Production Start-Up | A brief description of the sample | 16 boxes of Lime Treated 1/2-inch Type A HMA (eq. PG 64-28 M) with 25.0% RAP Aggregate and virgin PG 58-34 M from Albina (Klamath Falls, OR) |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Dawn | Last name of sampler or witnessed by | Sloatermen |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | D79336 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Hat Creek Construction and Materials - Ward Lake Plant (Litchfield, CA) | Transportation Laboratory (TL) Number | 858046 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | JMF3513 2023 14 | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-08-28-59
DIME Test ID: 2023-08-28-59-5
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-09-26
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Colt Sweeny
Date of test: 08/29/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3015.8 g
Mass of the specimen and specimen basket assembly prior to ignition: 4566.9 g
Mass of HMA Sample prior to ignition: 1551.1 g
Mass Loss: 111.5 g
Mass of aggregate remaining after ignition: 1439.6 g
Correction Factor (Percent by mass of HMA Specimen): 0.56 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.19 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.44 %
General comments (publicly viewable) (Max 1000 characters): Pb=6.44
Test was verified on 9/26/2023 ✔
