Summary for Test 2023-08-29-52-1
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 215494 DEA: 081H4904 EFIS: 0817000059 |
---|---|
DIST-CO-RTE-PM | 08-SBD-18-31.9/38.5 |
Award Date | 04/05/2021 |
Closeout Date | 01/18/2022 |
Work Description | COLD PLANE AC PAVEMENT AND OVERLAY WITH HMA (TYPE A). |
Location Description | SAN BERNARDINO COUNTY FROM 0.1 MILE EAST OF HILLTOP CONNECTOR TO 0.5 MILE EAST OF SIBERIA CREEK TRAIL |
QA Service Level | 1 (Verified on 07/06/2021) |
Sample Information
Sample Taken Date | 08/29/2023 | Sample Unique Key | 52 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/30/2023 |
Sample type | Quality Assurance | A brief description of the sample | 3/4" HMA A |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Blue Diamond | Last name of sampler or witnessed by | QC |
Title of sampler | qc | Telephone number of sampler | |
Laboratory sample identification | test 1 at108 ons out at0625am | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Blue Diamond Victorville | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | 1 |
Sublot number | 6 | HMA Mix Number | 300154 r15 |
Test Details
DIME Sample ID: 2023-08-29-52
DIME Test ID: 2023-08-29-52-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2023-09-08
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: tony price
Date of test: 08/31/2023
Cumulative percent passing the 2 in. sieve: 0 %
Cumulative percent passing the 1 1/2 in. sieve: 0 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 97 %
Cumulative percent passing the 1/2 in. sieve: 90 %
Cumulative percent passing the 3/8 in. sieve: 75 %
Cumulative percent passing the #4 sieve: 58 %
Cumulative percent passing the #8 sieve: 43 %
Cumulative percent passing the #16 sieve: 31 %
Cumulative percent passing the #30 sieve: 20 %
Cumulative percent passing the #50 sieve: 11 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 3.7 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/8/2023 ✔