Summary for Test 2023-08-07-74-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994120 DEA: 040J6314 EFIS: 0421000252 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-12-21.2/22.6 |
| Award Date | 09/27/2022 |
| Closeout Date | 01/09/2025 |
| Work Description | ROADWAY RESURFACING, INSTALL DRAINAGE SYSTEM, MIDWEST GUARDRAIL SYSTEM |
| Location Description | SOLANO COUNTY NEAR RIO VISTA FROM MCCLOSKY ROAD TO 0.1 MILE WEST OF AZEVEDO ROAD |
| QA Service Level | 1 (Verified on 09/13/2022) |
Sample Information
| Sample Taken Date | 08/07/2023 | Sample Unique Key | 74 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/07/2023 | Sample type | Quality Assurance |
| A brief description of the sample | 1/2-INCH HMA Types A and B W/12%RAP | The quantity of what the sample constitutes | LOT 1 SUBLOT 1 "B" |
| From where was the sample collected | Source | First name of sampler or witnessed by | Nick |
| Last name of sampler or witnessed by | Hall | Title of sampler | |
| Telephone number of sampler | 7072999133 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Teichert Vernanlis -Tracy Drum Plant | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | 1 |
| Sublot number | 1 | HMA Mix Number | 30240442412V |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-08-07-74
DIME Test ID: 2023-08-07-74-2
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-09-08
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 08/07/2023
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 1531.8 g
Mass Loss: 99.8 g
Correction Factor (Percent by mass of HMA Specimen): 5.17 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.18 %
Test Temperature: 482 C
Corrected Asphalt Binder Content: 1.17 %
General comments (publicly viewable) (Max 1000 characters): LOT b1 SUBLOT "B"
Drum Plant 12%RAP
Test was verified on 9/8/2023 ✔