Summary for Test 2023-08-04-73-5

Test performed: AASHTO T301-22

Project Information

Project IdentifiersProject ID: 215814
DEA: 023H3204
EFIS: 0217000097
DIST-CO-RTE-PM02-SIS-5-2.7/R15.9
Award DateNot set
Closeout DateNot set
Work DescriptionDunsmuir GAP - Pavement Rehabilitation.
Location DescriptionNot set
QA Service Level1 (Verified on 08/02/2021)

Sample Information

Sample Taken Date08/04/2023 Sample Unique Key73
Date that the sample was received by the laboratory/organization performing the testing08/23/2023 Sample typeDepartment Acceptance
A brief description of the samplePG 58-34 M (Valero - Benicia) The quantity of what the sample constitutes1 of 1 can
From where was the sample collectedSource First name of sampler or witnessed byC
Last name of sampler or witnessed byRogers Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameTullis Inc. - Northstate Asphalt (Redding CA)
Transportation Laboratory (TL) Number852775 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 58-34 M
ModifiedYes Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierValero Marketing & Supply - Benicia CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Test Details

DIME Sample ID: 2023-08-04-73
DIME Test ID: 2023-08-04-73-5
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2023-09-07

Test Results


Input Type: Measured
Tester's full name: Alonso Lopez-Sanchez
Date of test: 09/07/2023
Final Reading from the testing machine (X): 4.0 cm
% Elongation Recovery: 80 %
General comments (publicly viewable) (Max 1000 characters): ER

Test was verified on 9/7/2023 ✔