Summary for Test 2023-06-19-51-9
Test performed: CTM 389-19Project Information
| Project Identifiers | Project ID: 213811 DEA: 112T2184 EFIS: 1116000174 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-5-R38.4/R47.3 |
| Award Date | 10/29/2018 |
| Closeout Date | 01/03/2024 |
| Work Description | (Alternative Delivery) Construct HOV lanes, soundwalls, culvert rehab, ITS, and bike trail on I-5 . NCC I-5 Highway Improvement. |
| Location Description | IN SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE NORTH OF PALOMAR AIRPORT ROAD OVERCROSSING. |
| QA Service Level | 1 (Verified on 12/19/2018) |
Sample Information
| Sample Taken Date | 06/19/2023 | Sample Unique Key | 51 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/19/2023 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4" HMA PSU |
| The quantity of what the sample constitutes | 8 boxes 5 bags | From where was the sample collected | Source |
| First name of sampler or witnessed by | MARCO | Last name of sampler or witnessed by | ESTUDILLO |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Vulcan Carroll Canyon | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 220817 CC SJR R15 | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-06-19-51
DIME Test ID: 2023-06-19-51-9
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 389-19: Method of Test for Hamburg Wheel-Track Testing of Compacted Hot Mix Asphalt
Test Release Date: 2023-09-07
Test Results
Specified number of passes at 12.7 mm: 15000
Specimen Preparation Method:
Input Type: Measured
Tester's full name: Melchor Oronoz
Date of test: 07/28/2023
Test Temperature: 122 F
Compaction Method: SGC Cylindrical Specimen
Air Void Content for specimen A-1: no data
Air Void Content for specimen A-2: no data
Air Void Content for specimen B-1: no data
Air Void Content for specimen B-2: no data
Stripping Inflection Point (Wheel A): >15000
Stripping Inflection Point (Wheel B): >10000
Maximum impression at 5000 passes (left wheel): 2.23 mm
Maximum impression at 5000 passes (right wheel): 1.53 mm
Average impression at 5000 passes (left/right avg): 1.88 mm
Maximum impression at 10000 passes (left wheel): 2.56 mm
Maximum impression at 10000 passes (right wheel): 1.74 mm
Average impression at 10000 passes (left/right avg): 2.15 mm
Maximum impression at 15000 passes (left wheel): 2.77 mm
Maximum impression at 15000 passes (right wheel): 1.93 mm
Average impression at 15000 passes (left/right avg): 2.35 mm
Maximum impression at 20000 passes (left wheel): 2.98 mm
Maximum impression at 20000 passes (right wheel): 2.12 mm
Average impression at 20000 passes (left/right avg): 2.55 mm
Maximum impression at 25000 passes (left wheel): no data
Maximum impression at 25000 passes (right wheel): no data
Average impression at 25000 passes (left/right avg): no data
Raw Data: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/7/2023 ✔
