Summary for Test 2023-05-26-67-4
Test performed: CTM 504-June 2010Project Information
| Project Identifiers | Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55,55-29.6,R6.4/10.3 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION |
| QA Service Level | 1 (Verified on 06/24/2022) |
Sample Information
| Sample Taken Date | 05/26/2023 | Sample Unique Key | 67 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/27/2023 |
| Sample type | Quality Control | A brief description of the sample | 6x12 cylinders |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Brandi | Last name of sampler or witnessed by | McGuire |
| Title of sampler | QC Field Technician | Telephone number of sampler | |
| Laboratory sample identification | Set 4 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | job site | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | S85C440T19 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 33 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | Set 4 | |
| A detailed description of where the material sample was collected | Truck, STA 122-50 | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-05-26-67
DIME Test ID: 2023-05-26-67-4
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-08-30
Test Results
Input Type: Calculated
Tester's full name: Brandi McGuire
Date of test: 05/26/2023
Air Content: 1.9 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/30/2023 ✔
