Summary for Test 2023-07-22-9-1
Test performed: CTM 524-March 2013Project Information
| Project Identifiers | Project ID: 994803 DEA: 043J0704 EFIS: 0415000077 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-80-10.1/13.5 |
| Award Date | 03/10/2023 |
| Closeout Date | 10/06/2025 |
| Work Description | Remove PCC and AC, place PCP and AC Resurfacing. |
| Location Description | Construction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct. |
| QA Service Level | 1 (Verified on 05/10/2023) |
Sample Information
| Sample Taken Date | 07/22/2023 | Sample Unique Key | 9 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/22/2023 | Sample type | Quality Assurance |
| A brief description of the sample | HE4x12BM | The quantity of what the sample constitutes | Beam 20A |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Ignacio |
| Last name of sampler or witnessed by | Arechiga | Title of sampler | |
| Telephone number of sampler | 5102077252 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vangaurd | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | East Bound HWY 80 | |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | HE4x12BM |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | None | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Dischard fron concrete truck into wheelbarrow. | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-07-22-9
DIME Test ID: 2023-07-22-9-1
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Test Release Date: 2023-08-28
Test Results
Number of specimens: 1
Does the testing machine measure load or stress on the beam specimen?: Load
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Fracture occurred at a capped section: Yes
Is a beam dimensional correction factor used?: Yes
Input Type: Measured
Tester's full name: IGNACIO ARECHIGA
Date of test: 07/23/2023
Identification number: Con_23_169
Width of specimen: 6 inch
Depth of specimen: 6 inch
Span length of specimen: 20 inch
Maximum load applied: 380 lb
Correction Factor: 0
Cap thickness: 0 inch
Curing history and apparent moisture condition of the specimen: Bath/moist
If specimen was capped, ground or if leather shims were used: yes
Defects in specimen, including numbers of beams discarded during test: none
Age of specimen: 1 days
Age of specimen in hours: 14 hours
Modulus of rupture: 0 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/28/2023 ✔