Summary for Test 2023-08-17-52-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993318 DEA: 11423704 EFIS: 1116000059 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-8-R31.8/R41.7 |
| Award Date | 04/01/2022 |
| Closeout Date | 04/08/2025 |
| Work Description | PLACE CRCP, HMA, MGS, AND WATER POLLUTION CONTROL SYSTEM. |
| Location Description | SAN DIEGO COUNTY NEAR ALPINE FROM VIEJAS CREEK BRIDGE TO PINE VALLEY CREEK BRIDGE |
| QA Service Level | 1 (Verified on 10/27/2021) |
Sample Information
| Sample Taken Date | 08/17/2023 | Sample Unique Key | 52 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/18/2023 |
| Sample type | Quality Assurance | A brief description of the sample | 1/2" HMA |
| The quantity of what the sample constitutes | 8 boxes 3 bags | From where was the sample collected | Source |
| First name of sampler or witnessed by | Jesse | Last name of sampler or witnessed by | Fuentes |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 6525-PSU | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | CCA Lakeside | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | 21217005 | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-08-17-52
DIME Test ID: 2023-08-17-52-1
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-10-06
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Measured
Tester's full name: Daniel Smith
Date of test: 08/28/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 4012.7 g
Mass of the specimen and specimen basket assembly prior to ignition: 5550.6 g
Mass of HMA Sample prior to ignition: 1537.9 g
Mass Loss: 99.6 g
Mass of aggregate remaining after ignition: 1438.3 g
Correction Factor (Percent by mass of HMA Specimen): 0.73 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 F
Corrected Asphalt Binder Content: 5.75 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/6/2023 ✔