Summary for Test 2023-08-21-19-2

Test performed: AASHTO T176-08

Project Information

Project IdentifiersProject ID: 214493
DEA: 07311704
EFIS: 0715000013
DIST-CO-RTE-PM07-LA-134-0.0/R13.3
Award Date04/16/2020
Closeout Date07/09/2024
Work DescriptionCONCRETE SLAB REPLACEMENT, HMA PAVING, ELECTRICAL AND LANDSCAPE WORK.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES, BURBANK, GLENDALE AND PASADENA FROM ROUTE 101/134 SEPARATION TO JUNCTION OF ROUTE 210/710
QA Service Level1 (Verified on 04/15/2020)

Sample Information

Sample Taken Date08/21/2023 Sample Unique Key19
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/21/2023
Sample typeDepartment Acceptance A brief description of the sample1/2" RHMA-G
The quantity of what the sample constitutes1 Bag of Coldfeed Aggregate From where was the sample collectedSource
First name of sampler or witnessed byAvo Last name of sampler or witnessed byKarajian
Title of samplerTET Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameAAA - Irwindale Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-33-0005
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedColdfeed Chute
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2023-08-21-19
DIME Test ID: 2023-08-21-19-2
Testing Lab: CT D07 - Plant Services
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2023-08-31

Test Results


How many times will the test be run?: 3 Times
Input Type: Measured
Tester's full name: Avo Karajian
Date of test: 08/21/2023
Clay Level (Test 1): 5.4
Sand Level (Test 1): 3.8
Clay Level (Test 2): 5.5
Sand Level (Test 2): 3.8
Clay Level (Test 3): 5.4
Sand Level (Test 3): 3.9
Sand Equivalent (Test 1): 71
Sand Equivalent (Test 2): 70
Sand Equivalent (Test 3): 73
Sand Equivalent: 72
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/31/2023