Summary for Test 2023-08-21-19-2
Test performed: AASHTO T176-08Project Information
| Project Identifiers | Project ID: 214493 DEA: 07311704 EFIS: 0715000013 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-134-0.0/R13.3 |
| Award Date | 04/16/2020 |
| Closeout Date | 07/09/2024 |
| Work Description | CONCRETE SLAB REPLACEMENT, HMA PAVING, ELECTRICAL AND LANDSCAPE WORK. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES, BURBANK, GLENDALE AND PASADENA FROM ROUTE 101/134 SEPARATION TO JUNCTION OF ROUTE 210/710 |
| QA Service Level | 1 (Verified on 04/15/2020) |
Sample Information
| Sample Taken Date | 08/21/2023 | Sample Unique Key | 19 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/21/2023 |
| Sample type | Department Acceptance | A brief description of the sample | 1/2" RHMA-G |
| The quantity of what the sample constitutes | 1 Bag of Coldfeed Aggregate | From where was the sample collected | Source |
| First name of sampler or witnessed by | Avo | Last name of sampler or witnessed by | Karajian |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | AAA - Irwindale | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0005 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Coldfeed Chute | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1/2 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-08-21-19
DIME Test ID: 2023-08-21-19-2
Testing Lab: CT D07 - Plant Services
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2023-08-31
Test Results
How many times will the test be run?: 3 Times
Input Type: Measured
Tester's full name: Avo Karajian
Date of test: 08/21/2023
Clay Level (Test 1): 5.4
Sand Level (Test 1): 3.8
Clay Level (Test 2): 5.5
Sand Level (Test 2): 3.8
Clay Level (Test 3): 5.4
Sand Level (Test 3): 3.9
Sand Equivalent (Test 1): 71
Sand Equivalent (Test 2): 70
Sand Equivalent (Test 3): 73
Sand Equivalent: 72
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/31/2023 ✔
