Summary for Test 2023-07-11-67-3
Test performed: CTM 557-June 2020Project Information
Project Identifiers | Project ID: 993141 DEA: 060V1204 EFIS: 0616000207 |
---|---|
DIST-CO-RTE-PM | 06-MAD-99-R6.9/R7.6 |
Award Date | 06/22/2022 |
Closeout Date | Not set |
Work Description | Cottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS. |
Location Description | MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING |
QA Service Level | 1 (Verified on 07/28/2021) |
Sample Information
Sample Taken Date | 07/11/2023 | Sample Unique Key | 67 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/12/2023 |
Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 5 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Brenda | Last name of sampler or witnessed by | Amaya |
Title of sampler | QC Field Technician | Telephone number of sampler | |
Laboratory sample identification | Set 1 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Job Site | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | ND23502 |
---|---|---|---|
The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | Set 1 | |
A detailed description of where the material sample was collected | Pier 3 Column 4 and 5 | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-07-11-67
DIME Test ID: 2023-07-11-67-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2023-08-18
Test Results
Input Type: Calculated
Tester's full name: Brenda Amaya
Date of test: 07/11/2023
Temperature: 83 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/18/2023 ✔