Summary for Test 2023-08-16-36-3

Test performed: CTM 518-June 2010

Project Information

Project IdentifiersProject ID: 215180
DEA: 060Q9204
EFIS: 0614000010
COOP: 061764
DIST-CO-RTE-PM06-KER-99-10.4/21.2
Award Date12/08/2020
Closeout DateNot set
Work DescriptionCONSTRUCT CRCP AND HMA (TYPE A) PAVEMENT.
Location DescriptionKERN COUNTY IN AND NEAR BAKERSFIELD FROM 0.4 MILE SOUTH OF OLD US 99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING
QA Service Level1 (Verified on 09/14/2020)

Sample Information

Sample Taken Date08/16/2023 Sample Unique Key36
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/16/2023
Sample typeDepartment Acceptance A brief description of the sampleCRCP - 12 field beams and 4 standard beams
The quantity of what the sample constitutes190 CY From where was the sample collectedSource
First name of sampler or witnessed byJames Last name of sampler or witnessed byWatson
Title of sampler Telephone number of sampler6615498281
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHwy 223 off ramp sb 99 Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberG3-21-pCC-264
The truck number from where the sample was collected18 The batch plant ticket number from where the sample was collected19
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBack of Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-08-16-36
DIME Test ID: 2023-08-16-36-3
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2023-08-17

Test Results


Input Type: Measured
Tester's full name: James Watson
Date of test: 08/16/2023
Calibration factor: 4
Weight of (Measure + Concrete + Cover Plate): 45.7 lb
Weight of (Measure + Cover Plate): 8.58 lb
Total weight of cement: 6690 lb
Total weight of fine aggregate: 12294.4 lb
Total weight of coarse aggregate: 18220 lb
Total weight of water added during mixing: 2951.32 lb
Kelly Ball Penetration of the batch of concrete tested: 0.5 inch
Air content by the pressure method: 3.1 %
Station number or portion of the structure in which the concrete was placed: 479+50
Net weight of concrete: 37.12 lb
Total weight of all material in the mix: 40155.7 lb
Volume of the concrete: 10.016 yd^3
Unit weight of the concrete: 148.48 lb/ft^3
Cement content: 667.931 lb/yd^3
General comments (publicly viewable) (Max 1000 characters): P2 190CY 12 field and 4 standard cure beams beam set # 91 and 92 date of paving 8/16/23 night

Test File Attachments

File NameExtensionFile SizeDate UploadedTest IDActions
06-0Q9204_37085_230816_JW_plantreportpdf293.63 KB08/17/20232023-08-16-36-3   Info

Test was verified on 8/17/2023