Summary for Test 2023-03-08-81-1
Test performed: CTM 521-June 2020Project Information
| Project Identifiers | Project ID: 215348 DEA: 060U4204 EFIS: 0616000004 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-99-R4.9/11.6 |
| Award Date | 02/25/2021 |
| Closeout Date | 12/02/2025 |
| Work Description | CONSTRUCT CRCP, PLACE HMA, AND ROADWAY EXCAVATION. |
| Location Description | FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING |
| QA Service Level | 1 (Verified on 12/07/2020) |
Sample Information
| Sample Taken Date | 03/08/2023 | Sample Unique Key | 81 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/09/2023 |
| Sample type | Quality Control | A brief description of the sample | 4x8 concrete cylinders |
| The quantity of what the sample constitutes | 5 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Brian | Last name of sampler or witnessed by | Lovett |
| Title of sampler | QC Field Technician | Telephone number of sampler | |
| Laboratory sample identification | Set 1 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Job Site | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | G3-22-BAR-318 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 2 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | Set 1 | |
| A detailed description of where the material sample was collected | ST RTE 99 Barrier Wall, STA 219-30 | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-03-08-81
DIME Test ID: 2023-03-08-81-1
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2023-08-16
Test Results
Unit system used?: US Units
Number of specimens: 1
Test performed: With no density determined
Input Type: Calculated
Tester's full name: David Silva
Date of test: 03/15/2023
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 4.00 in
Maximum load on cylinder 1: 49230 lb
Type of fracture pattern of cylinder 1: 3
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Age of specimen: 7 days
Age of specimen in hours: 0 hours
Compressive strength of cylinder (to nearest 10 psi): 3920 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/16/2023 ✔
