Summary for Test 2023-03-07-68-6
Test performed: CTM 556-January 2018Project Information
| Project Identifiers | Project ID: 215348 DEA: 060U4204 EFIS: 0616000004 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-99-R4.9/11.6 |
| Award Date | 02/25/2021 |
| Closeout Date | 12/02/2025 |
| Work Description | CONSTRUCT CRCP, PLACE HMA, AND ROADWAY EXCAVATION. |
| Location Description | FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING |
| QA Service Level | 1 (Verified on 12/07/2020) |
Sample Information
| Sample Taken Date | 03/07/2023 | Sample Unique Key | 68 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/08/2023 | Sample type | Quality Control |
| A brief description of the sample | 4x8 concrete cylinders | The quantity of what the sample constitutes | 5 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Brian |
| Last name of sampler or witnessed by | Lovett | Title of sampler | QC Field Technician |
| Telephone number of sampler | Laboratory sample identification | Set 1 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Job Site | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | G3-22-BAR-318 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 2 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | Set 1 | |
| A detailed description of where the material sample was collected | ST RTE 99 Barrier Wall, STA 235-65 | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-03-07-68
DIME Test ID: 2023-03-07-68-6
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement Concrete
Test Release Date: 2023-08-16
Test Results
Input Type: Calculated
Tester's full name: Brian Lovett
Date of test: 03/07/2023
Slump: 0.25 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/16/2023 ✔