Summary for Test 2023-02-23-29-2
Test performed: CTM 202-November 2011
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Please click this
link
to view the corrected test.
Project Information
Project Identifiers | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-2.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. |
Location Description | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING |
QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
Sample Taken Date | 02/23/2023 | Sample Unique Key | 29 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/24/2023 |
Sample type | Quality Control | A brief description of the sample | 1in, 3/8 in, WCS |
The quantity of what the sample constitutes | 1 Bag | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Adrian | Last name of sampler or witnessed by | Lopez |
Title of sampler | QC Field Technician | Telephone number of sampler | |
Laboratory sample identification | Mix 1610838 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Job site | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-36-0040 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Set 1 | The fabricator/manufacturer designation for the sample | |
The plant number | A detailed description of where the material sample was collected | Belt | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | 1610838 | Lot number | 1 |
Sublot number | 1 | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-02-23-29
DIME Test ID: 2023-02-23-29-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2023-08-07
Test Results
What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Arian Lopez
Date of test: 02/24/2023
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 97 %
Cumulative percent passing the #8 sieve: 77 %
Cumulative percent passing the #16 sieve: 57 %
Cumulative percent passing the #30 sieve: 37 %
Cumulative percent passing the #50 sieve: 17 %
Cumulative percent passing the #100 sieve: 8 %
Cumulative percent passing the #200 sieve: 4 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/7/2023 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.