Summary for Test 2016-12-19-4-3
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 3807 DEA: 07121844 EFIS: 0700000117 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-42.8/47.3 |
| Award Date | 12/06/2010 |
| Closeout Date | 06/30/2021 |
| Work Description | CONSTRUCT HOV LANES, RETAINING WALLS AND SOUND WALLS. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES, GLENDALE, AND BURBANK FROM ROUTE 5/134 SEPARATION TO MAGNOLIA BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 02/23/2012) |
Sample Information
| Sample Taken Date | 12/19/2016 | Sample Unique Key | 4 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/17/2017 |
| Sample type | Quality Assurance | A brief description of the sample | Double Barrel Zap Screwlok |
| The quantity of what the sample constitutes | 8 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Jayson | Last name of sampler or witnessed by | Young |
| Title of sampler | Unknown | Telephone number of sampler | Unknown |
| Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | Barsplice Nucor | Transportation Laboratory (TL) Number | C687154 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | N/A | Structure unique identifier | Not set |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Nucor |
| Coupler Manufacturer | Barsplice | Intermediate Assembler or Fabricator | Unknown |
| Rebar Size | #5 / 7 Transition | Coupler Model | Double Barrel Zap Screwlok |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
| Coupler Component Heat/Lot Number(s) | 7/5DBZA 5204 5028 5161 5205 | Rebar Heat Number(s) | PL16202817 |
| Rebar Size 2 | Not set | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2016-12-19-4
DIME Test ID: 2016-12-19-4-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2017-01-25
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Fred
Date of test: 01/18/2017
UTM: 400KIP
Temperature: 72 F
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|
| 1 | 3 | Group 1 | #5/16mm \\ #7/22mm | 0.31 | 29890 | 96420 | Sevice Splice | Fred |
General comments (publicly viewable) (Max 1000 characters): Sevice Splice
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 1/18/2017 ✔
