Summary for Test 2023-06-05-70-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994345 DEA: 023J7804 EFIS: 0222000083 |
|---|---|
| DIST-CO-RTE-PM | 02-TRI-36-15.8/16.9,20.5/24.5 |
| Award Date | 12/22/2022 |
| Closeout Date | 08/22/2023 |
| Work Description | PLACE HOT MIX ASPHALT (TYPE A) AND REPLACE ASPHALT CONCRETE SURFACING. |
| Location Description | TRINITY COUNTY NEAR FOREST GLEN FROM 1.1 MILES WEST OF SOUTH FORK TRINITY RIVER BRIDGE TO SOUTH FORK TRINITY RIVER BRIDGE NO. 05-0026 AND FROM UPPER RATTLESNAKE CREEK BRIDGE NO. 05-0073 TO 0.3 MILE WEST OF TRINITY PINES ROAD |
| QA Service Level | 1 (Verified on 03/28/2023) |
Sample Information
| Sample Taken Date | 06/05/2023 | Sample Unique Key | 70 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/05/2023 |
| Sample type | Production Start-Up | A brief description of the sample | 16 boxes of Lime Treated 1/2-inch Type A HMA (eq. PG 64-16) with 25.0% RAP and virgin PG 58-22 from Valero – Benicia |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | JD | Last name of sampler or witnessed by | Atkinson |
| Title of sampler | Tester | Telephone number of sampler | |
| Laboratory sample identification | D79260 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Tullis - Northstate Asphalt - Redding, CA | Transportation Laboratory (TL) Number | 857934 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | 2105 | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-06-05-70
DIME Test ID: 2023-06-05-70-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2023-08-03
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean McWithey and Joe Mishoe
Date of test: 08/02/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3062.2 g
Mass of the specimen and specimen basket assembly prior to ignition: 4568.3 g
Mass of HMA Sample prior to ignition: 1506.1 g
Mass Loss: 92.9 g
Mass of aggregate remaining after ignition: 1413.2 g
Correction Factor (Percent by mass of HMA Specimen): 0.71 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.20 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.26 %
General comments (publicly viewable) (Max 1000 characters): Pb=5.26%
Test was verified on 8/3/2023 ✔
