Summary for Test 2023-06-05-65-5
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 993547 DEA: 081G7204 EFIS: 0816000057 COOP: 081666 Permit Numbers: 0819AOP0691 |
|---|---|
| DIST-CO-RTE-PM | 08--- |
| Award Date | 12/30/2021 |
| Closeout Date | Not set |
| Work Description | METS have reviewed the (Source Inspection Quality Management Plan) SIQMP, Rev1 submitted on behalf of The city of Lake Elsinore. We are glad to inform you that it significantly complies. |
| Location Description | Not set |
| QA Service Level | 2 (Verified on 01/31/2022) |
Sample Information
| Sample Taken Date | 06/05/2023 | Sample Unique Key | 65 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/21/2023 | Sample type | Verification |
| A brief description of the sample | PG Asphalt Binder | The quantity of what the sample constitutes | 1 Quart Can |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Victor |
| Last name of sampler or witnessed by | Capacete | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 0376-23 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | All American-Corona | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2023-06-05-65
DIME Test ID: 2023-06-05-65-5
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2023-09-11
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Majid Essa
Date of test: 07/24/2023
Any material loss from containers during heating process/testing?: Yes
Mass of empty container #1: 172.230 grams
Mass of empty container #2: 172.801 grams
Mass of container #1 before test (m1i): 207.174 grams
Mass of container #2 before test (m2i): 207.674 grams
Mass of container #1 after test (m1f): 207.155 grams
Mass of container #2 after test (m2f): 207.653 grams
Average mass change: -0.057 percent
General comments (publicly viewable) (Max 1000 characters): Corrected= -.057+.006=-.051
Test was verified on 9/11/2023 ✔
